Enerpac has launched its RP-70A hydraulic rail stressor and ZC3-Series battery powered stressing pump which offers a cordless, lightweight, zero emission, rail stressor equipment for rail monitor thermite welding.
Traditional fully assembled rail pullers are too heavy for operators to comfortably transport and deploy safely and shortly. Official RP70A stressor makes use of modular parts that can be assembled and put in on site with out the necessity for instruments, making preparation for rail stressing simpler and safer. Assembly sometimes takes less than two minutes.
The Enerpac rail stressing equipment is designed for railway upkeep crews who assemble and set up the rail puller directly on web site when adjusting the hole between rail ends for rail stressing, rail welding, repairing rail failures and servicing insulators. The sturdy, simple assembly components, including Enerpac ZC3-Series pump and hose set, are up to thrice lighter than similar tools. The complete package may be transported in an optional specifically designed metal transport frame.
The RP70A stressor has a 70-tonne pulling and 35-tonne pushing capability while holding the rail in impartial size in the course of the thermite welding process.
Share

Leave a Reply